How it Works
The blocks are installed with each inspection tunnel aligned
to give access throughout the complete soakaway or infiltration
system.
Using the connector plates (as supplied) at each end of the tunnels allows multiple
connections to be made, if required, for incoming pipework, inspection access
or venting.
Stormbloc® is considerably less prone to siltation
or blockage than other systems due to the clear flow path
through the system and can be periodically inspected or even
flushed out / cleaned if necessary.
|
 |