Grit King® Process  
 

  • Overview
  • How it works
  • Performance
  • Series 3 Grit Classifier
  • Grit-Cleanse™
  • Inquiries
  • Case Studies
  • maintenance
  • Animations
  • FAQ
  • Health
  • Install
  • Drawings
Installation
A typical Grit King® Process can be installed in 3 to 5 days, depending on the scope of the contract.

Typically the mechanical installation includes for the off-loading of the individual component items which usually comprise the following items: Separator, Pump, Classifier, and interconnecting pipework. These items are positioned and bolted down on prepared foundations constructed by others to HRD Technologies' dimensions. The items are then connected together with the pipework.

If electrical installation is required then cable ducts will be provided by the Client and HRD Technologies will cable between the items and the Control Panel.