Grit King® Process  
 

  • Overview
  • How it works
  • Performance
  • Series 3 Grit Classifier
  • Grit-Cleanse™
  • Inquiries
  • Case Studies
  • maintenance
  • Animations
  • FAQ
  • Health
  • Install
  • Drawings
  • Drawings
Grit King® Process
Fields marked * are required.
Client Information
*Contact Name:
*Company:
*Address:
*Town:
*County:
*Postcode:
*Tel:
Fax:
*E-mail:
Date of Enquiry:
 
Project information
*Project Name:
Site Location:
Type of Screen being used:
   
Design Criteria  
Peak Design Flow: l/s
Average Daily Flow: l/s
Dry Weather Flow (DWL): l/s
   
Inlet Works Information  
New
Existing
Inlet Gravity:
Pumped
If Pumped please give details:
Available Headloss:

   
Removal Requirements  
95% down to microns at peak flow. (Typically removal of 95% of all grit particles with a specific gravity of 2.65 down to 200 microns at peak design flow) .
Required faecal organic content:
(Typically "grits to be delivered to a skip with no more than 5% faecal organic content at peak design flow" with Series 4 Classifier) .
   
Optional Extras Avalable  
Grit Skip
Local Control Panel
Roller Conveyor
Electrical Installation
Mechanical Installation
Cold Weather Protection
 
AdditionalComments
Please enter any additional comments or design considerations:
   
Is the Enquiry for:  
Feasibility
Detail Design
Tender
Order
 

Please check that all information is correct, then... for free design service.